Then lag screw the ledger to the house using the fastener pattern approved in your plan.
Adding roof ledger to vinyl siding.
Attach your ledger board to your vinyl siding properly to have a sturdy moisture proof deck support by following these steps.
To tie the roof into the siding the tin roofing panels must first be installed to.
Unless it will be protected from rain by the house s eaves or a solid roof a roof ledger that is fastened directly to a house with wood siding should be capped with galvanized metal z flashing that tucks up under siding to prevent water from seeping in behind it.
Then tack the ledger into place with 16d nails.
Install undersill trim along the edge of the vinyl over the flashing at the top and bottom.
It only weighs 100 pounds it is a ledger board a front plate and eight 2x4 rafters sitting on two 4x4 posts.
The complexity of the job will vary with the size of roof from a simple entryway covering to one over a large screened in area.
Set the blade depth so you won t cut into the house sheathing below the siding.
I want to attach the ledger board directly into the hardiboard siding of the garage with lag screws using washers as spacers for drainage between the ledger and the siding.
That usually is done with a header or ledger board secured to the house.
The ledger board is a horizontal framing member usually two by 10 or two by 12 lumber that supports one side of a deck and attaches flat to the wall of a house after removing a section of siding.
Step 1 take measurements measure the distance between floor joists the height of the sill plate and add 1 2 inch for flashing to vent moisture from the ledger.
Wood or concrete siding will have to be cut away using a circular saw.
Make sure you have enough room to install flashing above the ledger board and allow for at least a space above the decking preventing water from wicking upwards into wood siding.
Next slide drip flashing behind the vinyl so the lip fits over the top of the ledger as shown at right.